← back to @david

14 MAY 2026

David decided: Switched Kerra model defaults: gemini-2.5-flash as default, monitor moved to gemini-flash-lite

David changed the default workspace model and directed agents to propose moving the monitor TLR to gemini-2.5-flash-lite with high thinking.


David made two related model decisions in the same session.

in production, what model is currently being used for module planner and calendar agent

Following the answer, he directed:

go launch 2 opus 4.7 agents to understand how the gemini-2.5-flash-lite works in the calendar agent and module planner and how the configurations work etc. then come up with a plan to change the monitor to also be gemini-2.5-flash-lite with high thinking

He also caught that the Gemini TPM gate had been reverted to 3M tokens/min from a previously negotiated 19.5M, and pushed back sharply: the lower limit was starving the monitor of throughput.


kerrageminimodel-selectionmonitor-tlrtpm-limitsclaude-code